C2D Solutions Pte Ltd

+65 6392 2949 info@c2d.com.sg 

Discover Our Projects with C2D Solutions

Delve into our diverse portfolio of engineering triumphs, each showcasing our unwavering commitment to excellence and ingenuity.
Lorem
ipsum
0
Lorem
ipsum
0
Lorem
ipsum
0

One Stop Solution

One stop shop for all your mechanical engineering needs, from concept development to design implementation, we deliver a holistic end to end solution.

Expertise & Experience

Unparalleled expertise and experience in industrial projects ,understanding the unique mechanical challenges to deliver optimised solutions .

PROVEN TRACK RECORD

With a track record of tackling complex challenges, we possess unique problem-solving skills hence delivering desired results.

CUSTOMIZED SOLUTIONS

We offer tailor-made design solutions customized to suit the individual needs and objectives to achieve maximum efficiency and effectiveness.

Our Esteemed Stakeholders

Welcome to our Projects page, where we showcase our diverse portfolio of innovative engineering solutions. From groundbreaking infrastructure developments to complex management systems, each project exemplifies our dedication to excellence and our ability to deliver tailored solutions that exceed expectations. Explore our past successes and discover how C2D Solutions Pte Ltd is shaping the future of engineering.

Project Details 

Type:
Mixed Development (Office, Commercial & Residential)

Location:
Singapore, Lots 00214K and 01585W TS 21 at 23 Mohamed Sultan Road
(River Valley Planning Area)

Owner:
23 MSR Pte Ltd

Working Partners:
Ronny Chin Architects Pte Ltd

Site Area:
333.10m2

Gross Floor Area:
1,265.78m2

Completion Year:
2020

23 Mohamed Sultan Road

Erection of a 4-Storey Residential Party Wall Infill Development with Office at Basement and Restaurant Use at 1st Storey (On Temporary Permission) on Front Plot, and an 8-Storey Residential Party Wall Flat Development with Attic (Total 13 Units) at Rear, with Sky Terrace and Mechanised Car Park

Services used in this project

Deluge Systems

Performance Based Fire Engineering Design

Full Hydraulic Calculations (FHC) for Fire Fighting Systems

Project Details 

Type:
Industrial (Manufacturing)

Location:
Singapore, LOT 04159K, 04359M & 04358C MK07 AT TUAS LINK 4

Owner:
3M Singapore

Working Partners:
EXYTE Singapore Pte. Ltd

Site Area:
102,685m2

Gross Floor Area: 21,587m2
Completion Year: 2017
Contract Sum: $125 Million

News Article:
View article link here

3M Tuas Phase 2 Expansion

New Erection of 3-Storey Single User Factory Building.

Services used in this project

Automatic Sprinkler Systems

Foam Water Suppression Systems

Hose Reel System

Hydrant Systems

Emergency Voice Communication System

Fire Detection Systems

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Audible & Visual Fire Alarm System

Plumbing & Sanitary

Project Details 

Type:
Industrial (Manufacturing)

Location:
3M Woodlands 100 Woodland Avenue 7, S(738205)

Owner:
3M Singapore

Working Partners:
International Facility Engineering Pte. Ltd

Gross Area:
20,000m2

Completion Year: 2020

3M Woodlands

Proposed A & A to Existing 3M Woodlands Plant.

Services used in this project

Automatic Sprinkler Systems

Foam Water Suppression Systems

Hose Reel System

Hydrant Systems

Emergency Voice Communication System

Fire Detection Systems

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Audible & Visual Fire Alarm System

Plumbing & Sanitary

Project Details 

Type: Industrial (Semiconductor Manufacturing Plant)

Location:
Singapore, Lots 05539C & 05440X PT, MK 13 at 1 North Coast Drive (Woodlands Planning Area)

Owner: 
Micron Semiconductor Asia Pte Ltd

Working Partners:
Air Liquide


Site Area: 200,140.40m2
Gross Floor Area: 143,485.53m2
Completion Year: 2020

Air Liquide Plant @ Micron

Additions & Alterations To Existing Semi-Conductor Development Involving Extension To Existing Warehouse, Crystal Growing, FAB 300 And Chemical Store.

Services used in this project

Automatic Sprinkler Systems

Pre-Action Sprinkler Systems

Foam Water Suppression Systems

Hose Reel System

Hydrant Systems

Fire Detection Systems

Emergency Voice Communication System

Audible & Visual Fire Alarm System

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Engineered Smoke Control System

ETTV

Plumbing & Sanitary

Tele-communication

Air-Conditioning System Efficiency

Natural Gas

Full Hydraulic Calculations (FHC) for Fire Fighting Systems

Project Details 

Type:
Commercial

Location:
Airport Boulevard

Owner:
Changi Airport Group

Completion Year:
On-going

Contract Sum: Undisclosed
Completion Year: 2020

Changi Airport Terminal 3

Consultancy Services for Toilet Ventilation Systems at Terminal 3, Singapore Changi Airport.

News Article

Micron breaks ground on new flash memory fabrication plant in Singapore.

Published by The Business Times on April 5 2019

“On 4 April 2018, SEMICONDUCTOR giant Micron Technology broke ground in the north of Singapore to add new cleanroom space to meet future manufacturing requirements for its 3D NAND flash memory products. … Construction of the new facility is expected to be completed in mid-2019, with initial wafer output expected in the fourth quarter of 2019.”

Services used in this project

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Project Details 

Type: Commercial (Airport & Retail)
Location: Singapore Changi Airport Terminal 3 Level 3 Departure / Transit Area on Lot 04594l Mk 31 at 65 Airport Boulevard S(819663)

Owner:
DBS

Gross floor: 350m2
Completion Year: 2020
Contract Sum: $2 Million

Changi Airport Terminal 3 – DBS Asia Treasures Lounge

Proposed Upgrading of DBS Asia Treasures Lounge.

Services used in this project

Automatic Sprinkler Systems

Deluge Systems

Hose Reel System

Fire Detection Systems

Emergency Voice Communication System

Audible & Visual Fire Alarm System

Engineered Smoke Control Systems

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Project Details 

Type:
Commercial (Airport & Retail)

Location: Singapore Changi Airport Terminal 3 DFS Retail Store at Level 2 Departure / Transit Area on Lot 04594l Mk 31 at 65 Airport Boulevard S(819663)

Owner:
DFS

Gross floor:
650m2

Completion Year:
2018

Contract Sum:
$15,000

Changi Airport Terminal 3 – DFS

Proposed Engineered Smoke Control System for DFS Retail Store.

Services used in this project

Fire Detection Systems

Engineered Smoke Control Systems

Performance Based Fire Engineering Design

Project Details 

Type:
Commercial (Airport)

Location:
Singapore Changi Airport Terminal 3 Level 3 Departure / Transit Area on Lot 04594l Mk 31 at 65 Airport Boulevard S(819663)

Owner:
Singapore Airlines

Working Partenrs:
Shimizu Corporation

Gross floor: 6,000m2
Completion Year: 2021

Contract Sum:
$40 Million

Changi Airport Terminal 3 – SIA Krisflyer Lounge

Proposed Upgrading of Singapore Airlines KrisFlyer Lounge.

Services used in this project

Deluge Systems

Water Monitor Systems

Fire Detection Systems

Engineered Smoke Control Systems

Project Details 

Type: Commercial (Airport & Retail)
Location: Singapore Changi Airport Terminal 3 Louis Vuitton Retail Store at Level 2 Departure / Transit Area on Lot 04594l Mk 31 at 65 Airport Boulevard S(819663)
Owner: Louis Vuitton (Singapore) Pte Ltd
Gross floor: 530m2

Completion Year:
2018

Contract Sum: $2 Million

Changi Airport Terminal 3 – Louis Vuitton

Proposed Engineered Smoke Control System for LV Retail Store.

Services used in this project

Fire Detection Systems

Engineered Smoke Control Systems

Performance Based Fire Engineering Design

Project Details 

Type:
Commercial (Airport &
Retail)

Location:
Singapore Changi Airport Terminal 3 On Lot 04594l Mk 31 At 65 Airport Boulevard S(819663)

Owner:
Changi Airport Group

Site Area: 1,276,000m2
Gross floor Area: 380,000m2
Completion Year: 2022

Contract Sum:
$7 Million

Changi Airport Terminal 3 Fire Alarm System

Replacement of Existing Automatic Fire Alarm System at Changi Airport Terminal 3.

Services used in this project

Fire Detection Systems

Emergency Voice Communication System

Audible & Visual Fire Alarm System

Engineered Smoke Control Systems

Project Details 

Type:
Mixed Development (Office & Residential)

Location: SSingapore, Lot 00415P, 1261A (PT) TS 23 at 70 Shenton Way (Downtown Core Planning Area)

Owner:
70 Shenton Way Pte Ltd

Working Partners: Ronny Chin Architects Pte Ltd
Site Area: 1840.20m2
Gross floor Area: 19,577.34m2

Completion Year:
2020

Eon Shenton, 70 Shenton Way

Amendment to the Approved Erection of 32 Storey Commercial Building Comprising of Shops on 1st Storey, 2 Basement of Carpark, 4 Storey Multi-Storey Carpark Podium, Offices (Lower Tower), Residential Flats (Upper Tower Total 132 Units) and 3 Storeys of Sky Terrace.

Services used in this project

Performance Based Fire Engineering Design

Project Details 

Type:
Commercial (Retail)

Location:
Singapore, Jurong East Central 1

Owner:
CapitalandMall Trust

Working Partners: Squire Mech Pte. Ltd

Gross floor Area:
29,426m2

Completion Year:
2012

Jcube Retail Mall

New Erection of 5-Storey Retail, 2 Basement Levels of Carpark and a Rooftop Landscaped Plaza.

Services used in this project

Fire Detection Systems

Engineered Smoke Control Systems

Project Details 

Type:
Commercial (Airport &
Retail)

Location:
Singapore, Lots 04966M, 04967W (PT), 04594L(PT) & 04969P(PT), MK 31 at Airport Boulevard

Owner:
Capitaland

Changi Airport Group

Working Partners: Provac International Pte Ltd

Site Area:
1,273,000m2

Gross floor Area:
135,700m2

Completion Year:
2019

Contract Sum:
$1.7 Billion

News Article:
View article link here

Jewel Carpark

5-Storey Commercial Building with Aviation, Attraction Facilities, 5 Basement Car Parks, 2 Underground Diesel Fuel Tanks and 2 Covered Pedestrian Link Bridges and Proposed Additions and Alterations Works to Part of Existing Terminal 1, 2 and 3.

Services used in this project

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Performance Based Fire Engineering Design

Computational Fluid Dynamics (CFD)

Project Details 

Type:
Industrial (Energy Utilities Company)

Location:
Singapore, 3 Jalan Pesawat

Owner:
SP Group

Working Partners: Soon Yan Engineering Pte Ltd

Completion Year:
2019

Jurong Pier Substation

Automatic Deluge Sprinkler System to Electrical Transformers.

Services used in this project

Automatic Sprinkler Systems

Deluge Systems

Hose Reel System

Audible & Visual Fire Alarm System

Project Details 

Type:
Residential (Strata Landed)

Location:
Singapore, Lorong Kismis

Owner:
Low Keng Huat (Singapore) Limited

Working Partners:
JGP Architecture (S) Pte Ltd

Gross Floor Area:
70,283m2

Completion Year:
2018

Kismis Residences

Fire Engineering Study to Waive Non-Compliance in Egress Provisions.

Services used in this project

Fire Engineering Assessment Waiver

Project Details 

Type:
Industrial (B1/B2 units)

Location:
Kallang Way

Owner:
Wee Hur Holdings Ltd

Working Partners:
Provac International Pte Ltd

Site Area:
39,229.1m2

Gross Floor Area:
98,072.75m2

Completion Year:
2018

Mega@Woodlands

Erection of a 8-Storey Multiple-User Clean, Light and General Industrial Factory Development (Total 512 Units) with Commercial Uses (Clinic & Minimart), 2 Temporary Industrial Canteens, 120 Heavy Vehicle Parking Lots and Other Ancillary Facilities.

Services used in this project

Engineered Smoke Control Systems

Performance Based Fire Engineering Design

Project Details 

Type:
Industrial (Semiconductor Manufacturing Plant)

Location:
North Coast Drive

Owner:
Micron Semiconductor Asia Pte Ltd

Working Partners:
Exyte Singapore Pte Ltd

Site Area:
165,529m2

Gross Floor Area:
259,948.16m2

Completion Year:
On-going

Contract Sum:
Undisclosed

Micron Fabrication Plant 10A

Proposed Erection of 3-Storey Fab Production Building, 2-Storey Central Utility Plant (CUP) Building with a Basement, Single Storey Bulk Speciality Gas Storage (BSGS).

 

Services used in this project

Automatic Sprinkler Systems

Pre-Action Sprinkler Systems

Foam Water Suppression Systems

Hose Reel System

Hydrant Systems

Fire Detection Systems

Emergency Voice Communication System

Audible & Visual Fire Alarm System

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Engineered Smoke Control Systems

Waste Water Treatment Systems

Scrubber Systems

ETTV

Plumbing & Sanitary

Tele-communication

Air-Conditioning System Efficiency

Natural Gas

Performance Based Fire Engineering Design

Full Hydraulic Calculations (FHC) for Fire Fighting Systems

Pollutant Recirculation Simulation

Project Details 

Type: Industrial (Semiconductor Manufacturing Plant)
Location: Singapore, Lots 05539C & 05440X PT, MK 13 at 1 North Coast Drive (Woodlands Planning Area)
Owner: Micron Semiconductor Asia Pte Ltd
Working Partners: Exyte Singapore Pte Ltd
Site Area: 200,140.40m2
Gross Floor Area: 143,485.53m2
Completion Year: 2017
Contract Sum: $4 Billion

Micron Fabrication Plant 10X

Additions & Alterations Involving New Extension to Existing 4-Storey Fab Production Building & 5-Storey Administration Building & New Erection of a 2-Storey Central Utility Plant (CUP) Building, Single Storey Bulk Speciality Gas Storage (BSGS), SAG Mitigation System, Pump House and Guard House.

Services used in this project

Automatic Sprinkler Systems

Pre-Action Sprinkler Systems

Foam Water Suppression Systems

Hose Reel System

Hydrant Systems

Fire Detection Systems

Emergency Voice Communication System

Audible & Visual Fire Alarm System

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Engineered Smoke Control Systems

Waste Water Treatment Systems

Scrubber Systems

ETTV

Plumbing & Sanitary

Tele-communication

Air-Conditioning System Efficiency

Natural Gas

Performance Based Fire Engineering Design

Full Hydraulic Calculations (FHC) for Fire Fighting Systems

Pollutant Recirculation Simulation

Project Details 

Type:
Industrial (Warehouse)

Location:
Jalan Buroh

Owner:
CWT Pte. Limited

Working Partners:
Visionics Engineering Pte Ltd

Site Area:
87,119.5m2

Gross Floor Area:
~222,154.73m2

Completion Year:
Base-Build: 2017, A&A: On-Going

Contract Sum:
Undisclosed

Nuclear (9-Storey Single-User Warehouse)

Erection of a 9-Storey Single-User Warehouse Development, Container Storage Retrieval System with Temporary Industrial Canteen.

 

Services used in this project

Engineered Smoke Control Systems

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Performance Based Fire Engineering Design

Project Details 

Type:
Institutional

Location:
Singapore, Lots 03891P, 03891K, 04340V, 04342T, 05023L, 05025M & 05112L MK 3 at 4 Architecture Drive, Singapore 117566 (Queenstown Planning Area)

Owner:
National University of Singapore

Working Partners:
CPG Consultants Pte Ltd   

Site Area:
1,406,665.30m2

Gross Floor Area:
1,177,633.04m2

Completion Year:
2020

Contract Sum:
$20 Million

NUS, School of Design And Environment

Additions & Alterations to Existing 4 & 5 Storey Buildings of School of Design and Environment Blocks 3 & 1 within National University of Singapore.

Services used in this project

Engineered Smoke Control System

Performance Based Fire Engineering Design

Project Details 

Type:
Industrial (Manufacturing)

Location:
Tuas Bay Drive

Owner:
Pacific Refreshments Pte Ltd

Working Partners:
Exyte Singapore Pte Ltd

Site Area:
Existing

Gross Floor Area:
~15,230.83m2

Completion Year:
On-going

Contract Sum:
Undisclosed

Pacific Refreshments Pte Ltd

Proposed Additions and Alterations Works to Existing 4-Storey Single-User Industrial Building Involving New Production, Offices & Ancillary Areas on Storey 1, 2, 3 & 4.

Services used in this project

Automatic Sprinkler Systems

Pre-Action Sprinkler Systems

Foam Water Suppression Systems

Hose Reel System

Hydrant Systems

Fire Detection Systems

Emergency Voice Communication System

Audible & Visual Fire Alarm System

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Engineered Smoke Control System

ETTV

Plumbing & Sanitary

Natural Gas

Air-Conditioning System Efficiency

Lightning Protection System

Full Hydraulic Calculations (FHC) for Fire Fighting Systems

Project Details 

Type:
Commercial (Retail)

Location:
Singapore, Lot 04633M, MK 03 at 1 Wholesale Centre

Owner:
Singapore Food Agency

Working Partners:
Exyte Singapore Pte Ltd

Site Area:
154,000m2

Gross Floor Area:
17,952m2

Completion Year:
On-going

Contract Sum:
2021

Pasir Panjang Wholesale Centre

Refurbishment and Improvement Works at Pasir Panjang Wholesale Centre.

Services used in this project

Performance Based Fire Engineering Design

Computational Fluid Dynamics (CFD)

Project Details 

Type:
Industrial (Manufacturing)

Location:
Kallang Wave

Owner:
}Micron Semiconductor Asia Pte Ltd

Working Partners:
xyte Singapore Pte Ltd

Site Area:
12,112.9m2

Gross Floor Area:
30,273.13m2

Completion Year:
On-going

Contract Sum:
Over $600 Million

Qualcomm 9 Kallang Sector

Proposed Fitting Out Works of Part 8-Storey / Part 4-Storey Single-User General Industrial Factory Development with One Basement Carpark and Other Ancillary Facilities.

Services used in this project

Waste Water Treatment Systems

Scrubber Systems

Project Details 

Type:
Commercial (Resort, Casino, Retail)

Location:
Sentosa, Singapore

Owner:
Genting Singapore

Resort World Sentosa

Resort Wide In-house Professional Engineering and Fire Engineering Services.

Services used in this project

Automatic Sprinkler Systems

Fire Detection Systems

Manual Call Point System

Testing to SCDF Fire Certification Requirement

Project Details 

Type:
Commercial (Resort, Casino, Retail)

Location:
Singapore, Lots 00424N, 00459M, 00554P PT, 00570V PT, 00571P PT, 00581C, 00582M PT, 01779P, 01783T, 01829L, 01830N PT, 072X PT & 01832L PT MK 34 AT SENTOSA

Owner:
Resort World Sentosa

Working Partner:
Squire Mech Pte Ltd

Site Area:
490,000m2

Completion Year:
2020

RWS, Resort World Theatre

Additions & Alterations to Existing La Vie Showroom at B1 & B2 as part of Existing Resorts World at Sentosa Development.

Services used in this project

Deluge Systems

Fire Detection Systems

Engineered Smoke Control Systems

Performance Based Fire Engineering Design

Project Details 

Type:
Industrial (Aircraft Maintenance)

Location:
Singapore, Airline Road Singapore

Owner:
SIAEC

Completion Year:
2011

SIA Engineering Company – Hangar 5

Computational Fluid Dynamics Simulations to optimize Aircraft Painting Quality

Services used in this project

Building Performance Simulation

Pollutant Recirculation Simulation

Project Details 

Type:
Industrial (Semiconductor Manufacturing Plant)

Location:
Singapore, Lots 02781P, 02781V & 03081C, MK 29 at 10 Tampines Industrial Avenue 5 & 12 Tampines Industrial Avenue 5

Owner:
Siltronic Silicon Wafer Pte. Ltd

Working Partner:
Exyte Singapore Pte Ltd

Site Area:
119,305.90m2

Gross Floor Area:
13,044.80m2

Completion Year:
2020

Siltronic Silicon Wafer Pte Ltd Fab 300 Extension

Additions & Alterations To Existing Semi-Conductor Development Involving Extension To Existing Warehouse, Crystal Growing, FAB 300 And Chemical Store.

Services used in this project

Automatic Sprinkler Systems

Pre-Action Sprinkler Systems

Foam Water Suppression Systems

Hose Reel System

Hydrant Systems

Fire Detection Systems

Emergency Voice Communication System

Audible & Visual Fire Alarm System

Air-Conditioning & Mechanical Ventilation (ACMV) Systems

Engineered Smoke Control System

ETTV

Plumbing & Sanitary

Tele-communication

Air-Conditioning System Efficiency

Full Hydraulic Calculations (FHC) for Fire Fighting Systems

Project Details 

Type:
Residential (Condominium)

Location:
Singapore, Lot 02639W, TS 17 at Sturdee

Owner:
SL Capital (1) Pte Ltd

Working Partner:
SL Capital (1) Pte Ltd

Site Area:
6,112m2

Gross Floor Area :
21,391m2

Completion Year:
2020

Sturdee Residences

New Erection of 2 Blocks of 30 Storeys Condominium (305 Units) with Landscape Deck, Basement carpark, Swimming Pool and Communal Facilities.

Services used in this project

Fire Engineering Assessment Waiver

Computational Fluid Dynamics (CFD)

Project Details 

Type:
Industrial (Semiconductor Manufacturing Plant)

Location:
Singapore, Lot 02283X, MK 29 at 70A Pasir Ris Industrial Drive 1

Owner:
Systems on Silicon Manufacturing Co. Pte. Ltd. (SSMC)

Working Partner: United Integrated Services Pte. Ltd.

Site Area:
22,000m2

Gross Floor Area:
19,969.57m2

Completion Year:
2019

Contract Sum:
$300 Million

News Article:
View article link here

Systems on Silicon Manufacturing Co. Pte. Ltd. (SSMC) Annex 10 Fabrication Plant

New Erection of 4-Storey Semi-Conductor Factory Production Building and Single Storey Central Utility Building.

Services used in this project

Automatic Sprinkler Systems

Foam Water Suppression Systems

Deluge Systems

Hose Reel System

Hydrant Systems

Fire Detection Systems

Emergency Voice Communication System

Audible & Visual Fire Alarm System

Emergency Voice Communication System

Engineered Smoke Control System

Waste Water Treatment System

Scrubber System

ETTV

Air-Conditioning System Efficiency

Natural Gas

Performance Based Fire Engineering Design

Full Hydraulic Calculations (FHC) for Fire Fighting System

Computational Fluid Dynamics (CFD)

Project Details 

Type:
Institutional

Location:
Tampines Street 61

Owner:
Ministry of Health Singapore

Completion Year:
2018

Contract Sum:
Undisclosed

Tampines Care Home

Fire Engineering Services to mitigate Non-compliance in Egress Provision for 8 Storey Nursing Home.

Services used in this project

Performance Based Fire Engineering Design

Fire Simulation

Project Details 

Type:
Commercial (Airport &
Retail)

Location:
Singapore, Lots 04966M, 04967W (PT), 04594L(PT) & 04969P(PT), MK 31 at Airport Boulevard

Owner:

Working Partner:
Provac International Pte Ltd

Site Area:
380,000m2

Gross Floor Area:
143,485.53m2

Completion Year:
2021

Terminal 3 Fire Protection System

Additions & Alterations to Existing Fire Protection System to Airport Terminal 3.

Services used in this project

Deluge Systems

Water Monitor System

Full Hydraulic Calculations (FHC) for Fire Fighting System

Project Details 

Type:
Industrial (Factory)

Location:
Singapore, Lots 01107N PT, 01108X PT, 01109L PT, 01112L PT & 02395A PT, MK 13 at Kranji Loop/ Kranji Road

Owner:
JTC Corporation

Working Partner:
ID Architects Pte Ltd
Mott Macdonald

Site Area:
59,700m2

Gross Floor Area:
1134,620m2

Completion Year:
2020

News Article:
View Straits Times article link here
View Channel News Asia link here

Timmac @ Kranji

Erection of a Multi-User Industrial Development Comprising a Block of 6-Storey & 4-Storey Factory with Ancillary Office (Total 86 Units), a 5-Storey Amenities Block with Industrial Canteen and a 3-Storey Utility Block.

Services used in this project

Engineered Smoke Control Systems

Performance Based Fire Engineering Design

Computational Fluid Dynamics (CFD)